RMI considers dry-dock
Journal 1/8/1973 P8 Marshalls considers dry-dock Skip Caukins, a design engineer working for the Trust Territory government, was in Majuro this week studying a proposed site for a marine railroad at the Mieco Beach area. The proposed dry dock is intended to take ships up to 171 feet. According to Caukins, the Mieco Beach site […]